Services

Engineering

  • Consultations & Specifications
  • Start-up and Commissioning
  • Power & Control Design
  • Motor control centers
  • Generators

Design/Build/Service

  • Custom Motor Starter Panels
  • Grounding and surge Protection Systems
  • Lighting Design and Specifications
  • Generator maintenances

AutoCAD Services

  • Single line diagrams
  • Wiring diagrams
  • P&ID’s
  • Mechanical
  • Civil/Structural

Troubleshooting

  • Control panels
  • Motor Starter Panels
  • PLCs & Marshaling cabinets

Installations

  • Industrial Residential & Commercial
  • Security System installation.
  • Motors and Motor Starters
  • Fire detection & Suppression
  • Motor Controls
  • Generators/ATS

Intelligent Technologies

  • IP and Telephone systems
  • System Admin & Network Solutions
  • Web Site Design (WordPress)
  • Wired and Wireless Network installation

Some Projects

  • firehouse electrical upgrades installation.
  • power and control design and installation.
  • start-up and commissioning.
  • wastewater treatment plant upgrades.
  • MCC Installation
  • Motor and motor control systems.
  • Power transformer Installations
  • PLC control systems design and programming.
  • Instrumentation installation

Some Projects Descriptions

MOTOR CONTROL STARTER PANELS

A Dual soft starter panel designed, built, and powered by Danfoss.


GENERATOR SERVICE

This Critical service Generator at a local hospital, required full service and testing to ensure or nations medical care services can go without worry should they suffer a power loss. TEIT is proud to be trusted with responsibility. We take all our clients’ projects seriously.


START UP AND COMMISSIONING

Electrical & Instrumentation installation at a booster station. Thereafter TEIT was tasked with successfully  commissioning the system


ENGINEERING AND DESIGN

This locally built MCC was Engineered and designed by TEIT. We directed the step-by-step manufacturing and testing. The Programming, Installation & commissioning of the control system was also proudly completed by TEIT engineering team.


INSTALLATION &  COMMISSIONING

An 8 section MCC system with over 45 starters & pumps. Powered by Allen Bradly, this system was verified,  programmed, and commissioning( mechanical, pumps, and electrical) by our professional engineering team. Proudly 1  more satisfied customer.